# Weekly Decision Memo - 2026-02-25

Generated: 2026-02-25 00:00 UTC

BLUF: This week: 0 BID, 3 WATCH; main bottleneck: manual_review_required; Shipbar: UNKNOWN (reason=receipt_not_found path=reports/evidence/tmp/self_b2_shipbar/date=2026-02-25/receipt.json); memo-quality: OK.

Quality: OK

## Trust & Coverage
- docs_accessibility_known_share: 1.000 (known=3/3; total_rows=3)
- competition_proxy_share_known: n/a (known=0/0; total_rows=3)
- deadline_best_present_share: 1.000 (known=3/3; total_rows=3)

## Recommendations
| Action | Score | Days-to-deadline | Buyer | Title | Why | Competition | Link |
| --- | ---: | ---: | --- | --- | --- | --- | --- |
| WATCH | 0.615 | 9 | Dundalk Institute of Technology_1155 | Ireland – Detection and analysis apparatus – Chemical imaging system, using laser direct infrared molecular imaging technology, for microplastics | manual_review_required | n/a | [open](https://ted.europa.eu/en/notice/118944-2026/html) |
| WATCH | 0.555 | 20 | DB Global Business Services (Bukr 1S) | Germany – Electric sensors – Sensoren für Getriebe, Fahrmotore und Stromrichter | manual_review_required | n/a | [open](https://ted.europa.eu/en/notice/119310-2026/html) |
| WATCH | 0.495 | 26 | Consejo Ejecutivo del Consell Insular de Menorca (CIM) | Spain – Sensors – Contratación del suministro, instalación, mantenimiento y servicios de dispositivos para el recuento y control de flujos de personas basado en la detección de terminales móviles y servicios de marketing de proximidad dentro del eje tres «Transición digital», de los proyectos del Plan de Sostenibilidad Turística en Destino del año 2021: Puerto de Maó. Puerto Sostenible 2030 (PSTD 2021)-UE | manual_review_required | n/a | [open](https://ted.europa.eu/en/notice/126522-2026/html) |

## Next actions
- Dates covered: 2026-02-25 to 2026-02-25
- Action feed days used: 0
- Recommendations: 3
- Shipbar receipt: reports/evidence/tmp/self_b2_shipbar/date=2026-02-25/receipt.json
- Shipbar context: run_date=2026-02-25; memo_week_id=2026-02-25_to_2026-02-25

## Top 5 opportunities + why
- Ireland – Detection and analysis apparatus – Chemical imaging system, using laser direct infrared molecular imaging technology, for microplastics (Dundalk Institute of Technology_1155): deadline=2026-03-06; action=WATCH; action_reason_codes=manual_review_required; why=manual_review_required
- Germany – Electric sensors – Sensoren für Getriebe, Fahrmotore und Stromrichter (DB Global Business Services (Bukr 1S)): deadline=2026-03-17; action=WATCH; action_reason_codes=manual_review_required; why=manual_review_required
- Spain – Sensors – Contratación del suministro, instalación, mantenimiento y servicios de dispositivos para el recuento y control de flujos de personas basado en la detección de terminales móviles y servicios de marketing de proximidad dentro del eje tres «Transición digital», de los proyectos del Plan de Sostenibilidad Turística en Destino del año 2021: Puerto de Maó. Puerto Sostenible 2030 (PSTD 2021)-UE (Consejo Ejecutivo del Consell Insular de Menorca (CIM)): deadline=2026-03-23; action=WATCH; action_reason_codes=manual_review_required; why=manual_review_required

## Top 5 data-quality to-dos
- manual_review: Ireland – Detection and analysis apparatus – Chemical imaging system, using laser direct infrared molecular imaging technology, for microplastics: assign analyst review owner.
- manual_review: Germany – Electric sensors – Sensoren für Getriebe, Fahrmotore und Stromrichter: assign analyst review owner.
- manual_review: Spain – Sensors – Contratación del suministro, instalación, mantenimiento y servicios de dispositivos para el recuento y control de flujos de personas basado en la detección de terminales móviles y servicios de marketing de proximidad dentro del eje tres «Transición digital», de los proyectos del Plan de Sostenibilidad Turística en Destino del año 2021: Puerto de Maó. Puerto Sostenible 2030 (PSTD 2021)-UE: assign analyst review owner.
- driver_radar_unavailable: Driver radar source missing; verify pressure join inputs.

## Join quality
- With driver pressure: None
- Missing driver pressure: None

## Driver radar
- Drivers unavailable: join_rate=0.000 < 0.200; candidates_with_basket_hint=107; missing_files=[none declared]. Regenerate: `uv run --locked python scripts/context/polymarket_driver_pressure.py --run-date 2026-02-25 --public-root public && uv run --locked python scripts/ops/driver_pressure_join_receipt.py --run-date 2026-02-25`. Receipt: reports/evidence/tmp/driver_pressure_join/date=2026-02-25/receipt.json
